The Point Development

Project Name: The Point Development
Project Location: Point Fraser, Perth

Description

Built by ADCO constructions Performance Tiling was contracted to complete all base build works at the Point Development on the riverfront in Perth. This included installing natural stone to all external areas and paths.

Performance Tiling was then contracted by the client to undergo tiling to several tenancies including The Point Bar and Grill and what was originally Perths very own Ku De Ta.

The Performance Screed Pump was used in conjunction with the Screed machine to boost efficiency enabling a fast turnaround time on the project.